fbpx

Rigging Expert

Talcher Town , Angul District , Orissa

clock3 Years
pound ₹100000 Per Month
buildings Thermal Power Plant Expansion Project

Description

  • Lifting Plans: Review lifting plans for heavy equipment and materials, considering safety, weight, and crane selection.
  •  Safety Compliance: Ensure that all rigging and lifting activities adhere to safety regulations and industry
    standards.
  •  Equipment Selection: Choose the appropriate rigging equipment, including slings, shackles, and lifting devices, for each specific lift.
  •  Risk Assessment: Identify potential hazards associated with lifting activities and implement risk mitigation strategies.
  • Training: Provide training to personnel involved in rigging and lifting, emphasizing safe practices and load handling techniques.
  •  Inspections: Conduct thorough inspections of rigging and lifting equipment to ensure their integrity and safety.
  •  Documentation: Maintain detailed records of equipment inspections, certifications, and lifting procedures.
  •  Emergency Response: Develop and implement emergency procedures for lifting-related incidents or accidents.
  •  Lift Execution: Collaborate with project teams to plan and execute heavy lifts in coordination with construction activities.
  •  Quality Control: Oversee the quality and integrity of rigging and lifting equipment used in the project to prevent equipment failures and accidents.